ITB- Coles Road Reconstruction Phase III

Start / End Dates & Times: 
07/25/2019 - 8:30am to 08/21/2019 - 10:00am
Bid: Closed
Status: 
Awarded

TOWN OF CROMWELL (Hereinafter called "TOWN") is seeking Separate sealed BIDS for 
COLES ROAD RECONSTRUCTION PHASE 3 FROM RTE. 9 TO RTE. 3
in Cromwell, Connecticut, Bids will be received by the Town of Cromwell , Cromwell Town Hall 41 West Street, Cromwell, Connecticut 06416 Public Works Department at the Department's Office until 10:00 AM, local time, Friday, August 21, 2019 and then, at said office, publicly opened and read aloud.
The project involves the reconstruction of approximately 3,061 linear feet of Coles Road between Route 9 and Route 3 with minor horizontal and vertical realignment, widening of the roadway, installation of bituminous concrete lip curbing, construction of an 80-foot-long retaining wall and construction of concrete sidewalk on one side of the road throughout the length of the project and significant excavation and lining with riprap the adjacent slope. Drainage work includes: installation of drainage facilities including approximately 27 storm drainage structures, approximately 1,190 linear feet of 12 in. to 36 in. reinforced concrete pipe, 800 linear feet of 15 in. to 24in. high density polyethylene pipe and approximately 2,200 linear feet of 6-inch underdrain.

Subscribe to Updates

The form below must be filled out, as this will ensure you automatically receive any associated addendums. Once completed, you will then be able to view the Bid/RFP.

Business Information

By clicking submit, you are acknowledging that you will receive an email notification with a link back to the website whenever an addendum is posted to this bid.